Actual total load

The term load in this illustration is the total final consumption in the APG control area, including grid losses. The load is usually published with an one-hour delay and is calculated as the sum of power plant feeds and imports minus the exports and consumption of pumped storage power plants, whereby a total plant schedule is used for all non-individually recorded power plants (usually small plants).

To maintain consistency with the data published according to Commission Regulation No 543/2013, the consumption of pumped storage power plants is not considered in the calculation of the term load.

The Tyrolean grid area has been included in the published load since 2011. The APG control area comprises all of Austria since 2012, with the exception of a corridor in Vorarlberg.

Actual Load

Click here for the overview page.

Contact

contact person placeholder

Team Transparency & REMIT

*APG is not liable for incorrect or missing information on the APG websites. Therefore, all decisions based on information from the APG website are the sole responsibility of the user. In particular, APG shall not be liable for any direct, specific or consequential damage or other damage of any kind whatsoever arising in connection with the indirect or direct use of the information provided on the APG websites.